Sterling Power Products 1250CE Benutzerhandbuch

Seite 2

Advertising
background image

these switches divide the battery charger

INSTALLATION OF

amp/hr into the battery bank size (

STERLING BATTERY

domestic bank ) e.g take a 25 amp charger

CHARGER

on a 200 amp hr battery bank = a ratio of
8 : 1 . if the ratio is between 1-4:1 leave

Position the charger in a cool dry well

all switches on and the equalizing time

ventilated space, ensuring a reasonable

will be approx 1hr, with a ratio of 5-9: 1

air flow around the charger ( do not

switch no 1 switch off, and this will

install in a cupboard or sealed

increase the equalizing time to about

compartment.

2hrs, with a ratio of 10-13: 1 switch nos 1
and 2 to the off position this will increase
the time to 3 hours, with a ratio of 14 - 18:
1 switch 1 2 and 3 to the off position,
this will increase the equalizing time to
about 4 hrs.or set up as per label hints.

install as close to the batteries as
possible, preferably within 2 meters of
the batteries.
Before installing, the charger must be
set up. beside the output terminals one

Having set the battery type switch and the

can see two sets of switches under the

equalizing time switches the charger

terminals, a switch bank of 3 small

should be installed, and need only be

switches and a large single switch.

altered in the event of a battery type

the large switch ( s1 ) changes the

change or battery bank size change.

equalizing or bulk charge voltage from
14.4 - 14.8 volts ( 28.8 - 29.6 for 24

The charger may be mounted in any

volt units ) the 14.4 volt position must

position . in the interests of safety connect

be used if gel or sealed lead acid

the cables to the charger and run them to

batteries are used on any bank ( always

the batteries, the correct cable to use is

avoid gel or sealed batteries for heavy

multi strand automotive type cable. each

cycling ), the 14.8 volt position should

strand is suitable to carry 1/2 an amp over

be used for conventional ventilated

about 2 meters, ie a 30 amp charger would

lead acid batteries and traction

require 50 strand copper cable.

batteries. if in doubt go for the 14.4
volt position,

Connect the cables as per the diagram,

The switch in the down position

ensure that all terminals are used, ie in the

confirmed by the top l.e.d being

event of only one battery being charged

yellow is suitable for standard lead

then connect the surplus positive output to

acid or traction batteries ( 14.8 volts/

the other used output, ie both outputs are

29.6 volts ) not suitable for gel or

on the same battery.

sealed batteries.
the small set of three switches changes
the time of the equalizing charge by
approx 1 hr per switch, in order to set

This unit is fitted with an automatic
110/230 volt crossover as such the
following voltage may be used ( 80-
130 or 170-280 volts at any
frequency ( 40-400 hz )

if

in doubt set to the standard setting as per
the label covering the output battery
terminals.

It is extremely important to join any
output terminal not being used on to one
which is in use , ie if only 2 outputs are to
be used then the third must be joined on

Advertising
Dieses Handbuch ist für die folgenden Produkte bezogen werden: