Assembly, Psen op lensshield operating instructions – Pilz PSEN op Lens Shield-2-050 Benutzerhandbuch

Seite 6

Advertising
background image

EN

1002402-2EN-01

PSEN op LensShield

Operating instructions

2

Pilz GmbH & Co. KG, Felix-Wankel-Straße 2, 73760 Ostfildern, Germany

Telephone: +49 711 3409-0, Telefax: +49 711 3409-133, E-Mail: [email protected] Original document

Assembly

Build the subassembly as shown in Figs. 1 and 2, but do not

completely tighten the screw

on the slot nut

, leaving space

between parts

and

(see Fig. 2).

Fig. 1

Fig. 2

Insert the subassembly into the groove on the PILZ product (PSEN

op series) as shown in Fig. 3, to achieve the status as shown in Fig.

4. The optimum position of the slot nuts on the light grid can be

taken from the Lo value in the table listed under Dimensions.

Fig. 3

Fig. 4


Leave
space

Advertising