Before starting the equipment assembly, Electrical safety, Environmental protection – Parkside PSE 2800 B2 Benutzerhandbuch

Seite 9: Connecting to earth, Operation

Advertising
background image

9

GB/IE

Safety Information

Safety Information / Before starting the equipment / Operation

Consumption at 2/3 load: approx. 1.36 l/h
Weight:

42 kg

LpA sound pressure level:

74,2 dB(A)

Uncertainty K:

2 dB(A)

LWA sound power level

96 dB(A)

K uncertainty:

2,3 dB(A)

Power factor cos ϕ:

1

Power class:

G1

Max. temperature:

40°C

Max. altitude (above

mean sea level):

1,000 m

Spark plug:

LD F6TC

Operating mode S1 (continuous operation)
The equipment can be continuously operated with
the quoted power output.
Operating mode S2 (temporary operation)
The equipment may be temporarily operated with
the quoted power output 2 min.

Before starting the equipment

assembly

The installation of the equipment requires
two open-ended wrenches (size 12).

Assemble all parts before filling in fuel and oil
in order to prevent the fluids from leaking out.

Assemble the foot

16

, wheels

14

and push

bar

18

as shown in Figures E - H.

To mount the wheels, first slide the axle

15

through the mountings on the bottom of the
generator and fit the wheels

14

as shown on

Figure F.

Electrical safety

J

Electric supply cables and connected equipment
must be in perfect condition.

J

The generator is to be operated only with
equipment whose voltage specifications conform
to the generator’s output voltage.

J

Never connect the generator to the power
supply (socket-outlet).

J

Keep the cable length to the consumer as short
as possible.

Environmental protection

Dispose of soiled maintenance material and
operating materials at the appropriate collection
point.

Recycle packaging material, metal and plastics.

Connecting to earth

The housing must be connected to earth in

order to discharge static electricity. To do this,
connect one end of a cable to the earth con-
nection

4

on the generator (Fig. B) and the

other end to an external earth.

Operation

IMPOrTanT! You must fill up with engine oil

(approx. 0.6 l) and fuel before you can start the
engine.

Check the fuel level and engine oil level, refill if
necessary by topping up the oil though the oil
filler screw

7

and the petrol through the petrol

filler cap

2

.

Make sure that the generator has sufficient
ventilation.

Make sure that the ignition cable is secured to
the spark plug.

Inspect the immediate vicinity of the generator.

Disconnect any electrical equipment which
may already be connected to the generator.

Advertising