Set-up / wall holder, First use – Nevadent DAZ 2.4 B2 Benutzerhandbuch

Seite 49

Advertising
background image

- 46 -

Set-up / Wall holder

The charging station 3 may only be operated free-standing
in dry rooms.
In moist rooms, especially in the vicinity of water (bath), the
charging station 3 must be fi rmly fi xed to the wall, to protect
it from falling into water.

• Pull the wall holder 4 downwards from underneath the

charging station 3.

• Using the screw openings of the wall holder 4, mark the

spacing for the boreholes on the wall. Check to ensure that
there is a mains power socket in close vicinity.

• Before boring the holes, check to ensure that there are no

electrical or water conduits behind the markings.

• Using a 5 mm drill, drill the marked holes and insert the

supplied wall plugs.

• Secure the wall holder 4 using the screws.
• When you have attached the wall holder 4, guide the

power cable through the right or left recess in the wall
holder 4 (see magnifi cation on the fold-out side).
Using the guide rails, slide the charging station 3 onto the
wall holder 4.

• Ensure that the power cable is not trapped and that it lies

properly in the recesses.

First use

Before taking the appliance into use check to ensure that it is
in a fault-free condition. If it is not, it may not be used.

• Insert the power plug into a wall socket.
• Before the fi rst use, clean the new brush heads 1 with

clear water.

• Place a replacement brush head on the brush holder 2,

open the cover of the charging station 3 and slide the
brush holder 2 in.

IB_42776_DAZ24B2_DE_NL.indb 46

IB_42776_DAZ24B2_DE_NL.indb 46

23.10.13 09:04

23.10.13 09:04

90 mm x 150 mm

Advertising