Installation, Inspecting your shipment, Site requirements – Enterasys Networks VH-8TX1UM Benutzerhandbuch

Seite 29: Inspecting your shipment site requirements

Advertising
background image

9033718-01

Installation 15

2. INSTALLATION

Inspecting Your Shipment

When you receive the shipment of your switch, check the package

contents and make sure you have the following items:

VH-8TX1UM or VH-8TX1MF switch

Mounting ears and mounting screws

Four rubber feet

ESD wrist strap

Power cord

RS-232 null-modem cable

Product documentation

Site Requirements

Before you install the switch, make sure the site meets the following

requirements:

Mounting
Provide a flat table, shelf surface, or an optional 19 in. (48.3 cm)

equipment rack.
Use an EIA standard equipment rack that is grounded and physically

secure.

Power source
Provide a power source within six feet (1.8 m) of the installation

location. This source must provide 100 VAC to 240 VAC at 50 to

60 Hz, for 90 VA maximum power consumption. Power specifications

for the switch are shown in Appendix A, “Technical Specifications.”

Environmental
Install the VH-8TX1UM/VH-8TX1MF switch in a dry area, with

adequate air circulation. Avoid placing the switch in direct sunlight or

near other heat sources, such as hot-air vents. For temperature and

humidity specifications, see Appendix A, “Technical Specifications.”

Ventilation
Do not restrict airflow by covering or obstructing air inlets on the side

of the switch.

NOTE: Primary voltage selection within the above
ranges is automatic and requires no user action.

Advertising