Site requirements desktop installation, Site requirements, Desktop installation – Allied Telesis AT-FS709 Benutzerhandbuch

Seite 22

Advertising
background image

Installation

6

Site Requirements

Make sure you observe the following site requirements:

Make sure you are placing the switch in a dust-free and moisture-free
environment.

Do not block ventilation openings on the unit.

Make sure that the switch’s power is accessible and cables can be
connected easily.

Cabling should be away from sources of electrical noise such as radios,
transmitters, broadband amplifiers, power lines and fluorescent
fixtures.

Do not place objects on top of the switch.

Use dedicated power circuits or power conditioners to supply power to
the switch.

Desktop Installation

1.

Place the switch on a flat, level surface where power is easily

accessible.

2.

Attach one end of the power cord to the back of the switch and the

other end to the power source. Make sure the POWER LED on the
front panel lights green.

3.

Attach the data cables and observe normal operation as indicated by

the port LEDs. See Table 2 on page 3 for LED status.

Note

Do not plug a phone jack connector into any RJ45 port. This may
damage the switch. Use only twisted-pair cables with RJ45 connectors
that comform with FCC standards.

Advertising