Programming scheme, N 214 – Baumer N 214 Benutzerhandbuch
Seite 13

N 214
www.baumer.com
13
8. Programming scheme
Lines 11-16
Status for line 1-6
0
Parameter can be changed
1
Deletion or input disabled
2
Parameter is skipped
Line 21
Start value
0
Default
-999999
Min.
999999
Max.
Line 22
Operating modes
0
Progressive preselection
1
Principal preselection
2
Parallel comparison
3
Trailing preselection P1
Line 23
Scaling factor
1.0000
Default
00.0001
Min.
9999.99
Max.
Line 24
Decimal point
0
No decimal point
1
00000.0
2
0000.00
3
000.000
4
00.0000
Line 25
Counting mode
0
Track A if necessary UP/DOWN signal
on track B
1
Difference count (A-B)
2
Sum count (A+B)
3
Track A 90° B Single analysis
4
Track A 90° B Double analysis
5
Track A 90° B Fourfold analysis
Line 26
Frequency main counter track A
0
10 kHz
1
25 Hz
2
3 Hz
Line 27
Frequency main counter track B
0
10 kHz
1
25 Hz
2
3 Hz
Line 28
Input logic
0
PNP – switching threshold 11V
1
NPN – switching threshold 11V
2
PNP – switching threshold 5V
3
NPN – switching threshold 5V
4
PNP – switching threshold 2,5V
5
NPN – switching threshold 2,5V
Line 29
Reset main counter
0
Autom. reset and ext. static
1
Autom. reset und ext. diff.
2
Ext. static
3
Ext. differentiated
Line 30
Reset key function enable
0
Reset key enabled
1
Reset key disabled
Line 31
Function signal input 9
0
Stop
1
Hold
2
Keylock
3
Time meter on/off
4
Line 32
Output contact assignment
0
In case of 0 contact
1
In case of start value
Line 33
Output logic for digital outputs
0
Both outputs as make contacts
1
P1 break contact, P2 make contact
2
P1 make contact, P2 break contact
3
Both outputs as break contacts