Operating Elements

1 Lid
2 Unlocking button
3 ON/OFF switch
4 Base
5 Rolled-up cable
6 Control lamp
7 Scale
8 Pourer sieve

Start-up

• Before taking the appliance into use, ensure that...
– the appliance, the plug and the power cable are

in good working order and...

– all packaging materials have been removed

from the appliance.

• Fill the appliance with water up to the MAX

mark and let it come to a full boil once – as des-
cribed in the next section.

• Pour this water away when the procedure has

been completed.

• Rinse the kettle out with clear water.
• Fill the appliance with water up to the MAX mar-

king on the scale 7 and then bring it to the boil.
Once again, pour this water away.

The appliance is now ready for use.

Boiling water



Danger!

Never place the electrical base 4 in close proxi-
mity to water – a potentially fatal risk!

Notice:

Always use freshly drawn water. Do not consume
any water that has already stood in the water boiler
for longer than one hour. Do not reboil water that
has cooled down. Always pour old water away.
Microbes could have formed in it!

• Lift the kettle off of the base when filling it!
• Press the unlocking button 2 and open the lid

1.

• Hold the kettle upright while filling it.

Only in this way can you correctly read the mar-
kings on the scale 7.
Fill the kettle...

– at least to the MIN mark, so that the appliance

does not overheat,

– no higher than the MAX mark, so that no boiling

water spills out.

• First close the lid 1...
• then place the kettle on the base 4 so that it

stands straight on the base 4.

• Now insert the plug into the power socket.
• Press the ON/OFF switch 3 down until it enga-

ges downwards.

• The control lamps 6 indicates that the applian-

ce is now heating up.

• The appliance switches itself off and the control

lamps 6 go out as soon as the water is on the
boil. The ON/OFF switch 3 is released up-
wards.

IB_68664_SWKS2400B1_LB3 29.09.2011 8:46 Uhr Seite 3

Advertising