Gb 7. maintenance, cleaning and recalibration – WIKA CPB3800 Benutzerhandbuch

Seite 40

Advertising
background image

40

WIKA operating instructions model CPB3800

14062232.03 12/2013 GB/D

GB

7. Maintenance, cleaning and recalibration

7.4.4 Overhaul and re-certification

To provide the best possible service, the pressure balance should be returned as

complete units comprising the base, the piston and cylinder unit, and all the weights.

The base can also be serviced itself. The piston-cylinder unit with weights has to be sent

back for overhaul. In such instances, certification issued after overhaul can only refer to

the piston and cylinder and weight set numbers and not to the base to which they were

originally fitted.

Pressure balance bases will be stripped, all pipework cleaned, all seals replaced, worn

components replaced where desirable, and all reassembled and tested.

The weights will all be checked and brought to within original limits if possible. If one or

two weights are missing or beyond economical repair they will be replaced. If more are

missing/ beyond economical repair customer instructions will be sought.

The piston unit will be checked for accuracy and sensitivity. If it is not satisfactory for any

reason a quotation will be submitted for a replacement unit.

A new certificate of accuracy will be issued for each overhauled pressure balance.

Unless otherwise instructed on order when there has been a slight change in area of

the piston unit the certificate will reflect this; the accuracy will not be affected by more

than 0.03 %. For example the certificate of accuracy of an overhauled pressure balance

might show that the error does not exceed 0.05 % when the original certificate shows

that the error did not exceed 0.02 %.

We can issue an UKAS or DKD/DAkkS certificate of calibration for an overhauled

system. Details will be supplied on request.

Advertising