Mechanical installation – Lenze EL 9700 Benutzerhandbuch

Seite 83

Advertising
background image

Mechanical installation

Mounting steps

Panel PC EL 2700 / EL 2750 / EL 5700 / EL 5720 / EL 5750 / EL 5770 / EL 9700

4

l

83

LDCDS−ELx7xx DE/EN 4.0

4.3.2

Panel PC EL 2700 / EL 2750 / EL 5700 / EL 5720 / EL 5750 / EL 5770 / EL 9700

)

Note!

The EL 5720, EL 5750 and EL 5770 types can be installed in any control board
and in 19" mounting racks to DIN 41494.

Control board mounting

Proceed as follows for the mounting:

1. Prepare the control board by cutting the mounting cutout and drilling the mounting

holes into it (

81).

2. Check that the gasket under the front panel is located correctly.

3. Place the device in the mounting cutout, secure it by hand against falling down and

screw the nuts and washers onto the threaded bolts.

4. Fit all screw clamp fixings as explained below:



‚

ƒ

ELx7xx−012

– Insert the screw clamp fixing into the slot in the housing of the device (see above

figure).

– Press the screw clamp fixing downwards, tilt it towards the housing and check

that it has firmly snapped into place.

– Tighten the screw clamp fixing hand−tight with a screwdriver.

5. Check that the device is securely located in the mounting cutout and that the front

panel gasket is located correctly.
– If necessary, realign the device/gasket.
– If the gasket is not located correctly, protection class IP65 is not achieved on the

front of the device!

Advertising
Dieses Handbuch ist für die folgenden Produkte bezogen werden: