Programming scheme, N 214 – Baumer N 214 Benutzerhandbuch

Seite 13

Advertising
background image

N 214

www.baumer.com

13

8. Programming scheme

Lines 11-16

Status for line 1-6

0

Parameter can be changed

1

Deletion or input disabled

2

Parameter is skipped

Line 21

Start value

0

Default

-999999

Min.

999999

Max.

Line 22

Operating modes

0

Progressive preselection

1

Principal preselection

2

Parallel comparison

3

Trailing preselection P1

Line 23

Scaling factor

1.0000

Default

00.0001

Min.

9999.99

Max.

Line 24

Decimal point

0

No decimal point

1

00000.0

2

0000.00

3

000.000

4

00.0000

Line 25

Counting mode

0

Track A if necessary UP/DOWN signal
on track B

1

Difference count (A-B)

2

Sum count (A+B)

3

Track A 90° B Single analysis

4

Track A 90° B Double analysis

5

Track A 90° B Fourfold analysis

Line 26

Frequency main counter track A

0

10 kHz

1

25 Hz

2

3 Hz

Line 27

Frequency main counter track B

0

10 kHz

1

25 Hz

2

3 Hz

Line 28

Input logic

0

PNP – switching threshold 11V

1

NPN – switching threshold 11V

2

PNP – switching threshold 5V

3

NPN – switching threshold 5V

4

PNP – switching threshold 2,5V

5

NPN – switching threshold 2,5V

Line 29

Reset main counter

0

Autom. reset and ext. static

1

Autom. reset und ext. diff.

2

Ext. static

3

Ext. differentiated

Line 30

Reset key function enable

0

Reset key enabled

1

Reset key disabled

Line 31

Function signal input 9

0

Stop

1

Hold

2

Keylock

3

Time meter on/off

4

Print

Line 32

Output contact assignment

0

In case of 0 contact

1

In case of start value

Line 33

Output logic for digital outputs

0

Both outputs as make contacts

1

P1 break contact, P2 make contact

2

P1 make contact, P2 break contact

3

Both outputs as break contacts





Advertising