Commissioning – Xylem ISE Electrodes Ag-S 60 Benutzerhandbuch

Seite 14

Advertising
background image

Commissioning

The combination electrode is now ready to measure. Always

leave the refilling opening of the reference electrode open
while measuring.

When operating the electrode ensure that:

x the filling opening for the bridge electrolyte is open

x the inner junctions are covered with bridge electrolyte

x no air bubbles are in the bridge electrolyte

x the depth of immersion is within the optimum range:

Minimum depth of immersion:

The diaphragm must be covered

Maximum depth of immersion:

Approx. 1 cm below the fluid level of the bridge electrolyte

Calibration

Calibrate according to the data given in the operating
manual of the measuring instrument and the analysis
specification.

When operating the electrode ensure that:

x the filling opening for the bridge electrolyte is open

x the inner junctions are covered with bridge electrolyte

x no air bubbles are in the bridge electrolyte

x the depth of immersion is within the optimum range:

Advertising