Electrical installation – Lenze CPC 5100 Benutzerhandbuch

Seite 55

Advertising
background image

Electrical installation

Connecting and disconnecting the battery pack of the optional UPS

5

l

55

LDCDS−CPC5100 DE/EN 1.1

5.3

Connecting and disconnecting the battery pack of the optional UPS

For the UPS functionality the battery pack has to be attached before commissioning the
IPC.

If the IPC is disconnected from the mains for a longer time (e. g. transport, storage), the
battery pack has to be disconnected, as otherwise the rechargeable batteries of the battery
pack may be damaged by an exhaustive discharge.

Netzteil Typ A

AUDIO

VGA

MIC

USB

USB

IN

OUT

LAN

MOUSE

COM1

KEYB

X 2

X 2

X 1

X 1

POWER

STANDBY

HD

RESET

CTRL

SLOT

A

B

C

D

E

F

G

1

1

2

I

0

3

0

CPC5100−009

How to connect or disconnect the battery pack

0:

1. Remove the two screws

1.

2. Carefully push the housing cover

2 slightly to the right and pull it forward (for

vertical mounting see illustration).

3. Connect or disconnect the connector

3.

4. Carefully place the housing cover

2 on the housing.

5. Tighten the two screws

1.

Advertising