Calibration – Weidmuller STG - Bridge measuring transducer Benutzerhandbuch

Seite 18

Advertising
background image

18

•Calibration

General

All instruments are fully calibrated before leaving the factory. For best

results, you may need to adjust the zero and span after installation,
since the actual load may vary.

Equipmentrequirements
• A suitable DC millivolt source
• Two accurate digital multimeters (accurate to 0.0 mV and ±0.1 μA)
• Flat bladed screwdriver (blade width less than .4 mm / 0.1 inch)

Terminalconnectionsforworkshopcalibration

Connect

Signaltype

Terminal

DC millivolt source

0 V Refence (Link to Terminal 8) 6
Input signal mV (+)

7

Input signal mV (−)

8

Multimeter one

Output signal mA or V (+)

13

Output signal mA or V (−)

14

Multimeter two

TARE adjustment mV (+)

Test Point (Ex+)

TARE adjustment mV (−)

Test Point (Ex–)

Wire link

Excitation Voltage (+)

3

Excitation Sense (+)

2

Wire link

Excitation Voltage (−)

4

Excitation Sense (−)

1

Power supply

Neutral (−)

10

Live (+)

11

ZEROandSpANadjustment

The TARE, ZERO and SpAN controls are on the front panel of the

transmitter. Turn the control clockwise to increase adjustment.

Note: ‘zero’ means the lowest point in the signal range, so for a

4-0 mA signal, ‘zero’ is 4.00 mA. ‘Full scale’ refers to the highest point
in the signal range.

Advertising