Power up sequence – Vanguard Managed Solutions Vanguard 6435 Benutzerhandbuch
Seite 107

Powering Up Your Vanguard 6435/6455
4-3
Power Up Sequence
Power Up Sequence
Introduction
One of two processes occur when you power up the Vanguard 6435/6455:
• The Vanguard 6435/6455 coldloads the operating software (Applications
Ware) and then initiates a node boot.
• The Vanguard 6435/6455 initiates a node boot using previously loaded
operating software (Applications Ware).
During the software loading and boot process, a series of messages appear on the
front panel display. These message sequences are described below. If something
other than these messages appear, or if the message ERR: Bad FLASH appears, a
problem has been encountered.
For a description of all the front panel messages, refer to the “Front Panel Display
Messages” section on page 4-6.
Coldloading the
Software
This table shows the sequence of LCD messages that appear when a Vanguard
6435/6455 is coldloading the software:
Note
If the Vanguard 6435/6455 unexpectedly stops loading, it does not lock up.
Instead, it restarts the load cycle from the beginning.
Step
Display Message
1
BootPROM Vnn
2
Need Coldload
3
Erasing FLASH
4
Send FLASH Image
5
Writing to FLASH
6
Coldload Done
7
BootPROM Vnn
8
Loading FIPL
9
Loading FBIST
10
Testing Node
11
BootPROM Vnn
12
Loading FIPL
13
Loading ONS
14
Booting ONS
15
BootPROM Vnn
16
--- Node Up ---
Note: nn is the version number.