Installation of wolfvision’s ceiling mount – WolfVision VZ-C32 3 Installation Benutzerhandbuch
Seite 8

Mounting the Visualizer on the ceiling using WolfVision's ceiling mount can be done very quickly and easily.
IMPORTANT!
The ceiling mount must be affixed directly with three steel anchors as illustrated in fig.1 to concrete to
ensure a secure mounting and operation of the Visualizer! Ensure that the ceiling construction is able to
carry a weight of 80 kg (176 pounds) and that possible collision accidents are prevented.
fig.1
Direction
of the user
Final position of
Visualizer with
ceiling mount
Direction
of the user
concrete
min. 61
Ø 8
Inch
mm
8
0.315
15
0.59
17
0.67
61
2.4
min. 15
max. 17
IMPORTANT: Please give special attention to the country specific regulations for
training and conferencing rooms.
G
G
IMPORTANT: Ensure solid mounting and secure connection of all parts to avoid the
possibility that the unit detaches itself from the ceiling.
INSTALLATION OF WOLFVISION’S CEILING MOUNT
7