6. Commissioning, operation

6. Commissioning, operation

6.1 Unpacking the comparison test pump

As soon as possible after delivery open the packaging of the comparison test pump and

check that you have all the items detailed in the packing list (see chapter 4.2 “Scope

of delivery”). As you are unpacking the items, examine them for signs of damage or

breakage during transit.

If any items are missing get in touch immediately with DH-Budenberg/WIKA to inform us

of the shortage.

6.2 Environmental requirement

When siting the comparison test pump not in a temperature controlled laboratory, look

for an area that satisfies the following criteria as much as possible:

A constant temperature area free from draughts and sources of heat or cold

An area free from noise and vibration, constantly used pathways

A clean dry area free from corrosive liquids or vapours

A strong, stable, level table or workbench with the capability of supporting the system

with sufficient space to operate is required.

6.3 Assembly of base units
Fastening base to bench

The base is to be mounted on a firm, level table or bench about 0.9 m high. The centre

line of the front adjustable feet of the unit should be about 40 mm from the front edge of

the bench to allow adequate clearance for the handwheel.

1. Mark the position of the adjustable feet of the unit on the top of the bench.
2. Position a level plate at the centre of each of the adjustable feet of the unit and screw

the plate to the bench to ensure that the comparison test pump is rigid.

3. Fit the base unit on the bench with the adjustable feet on the level plates and the

handwheel shaft projecting over the front of the bench.

4. Screw in the four handwheel spokes into the hub.
5. Using the spirit level provided, level the test pump by adjusting the four knurled feet.

Advertising