Installation of wolfvision’s ceiling mount – WolfVision VZ-C30 Installation Benutzerhandbuch
Seite 6

INSTALLATION OF WOLFVISION’S CEILING MOUNT
For security reasons we are unable to provide fastening equipment for the ceiling mount with
the Ceiling Visualizer. We request that you acquire the appropriate fastening material for your
particular ceiling construction at your local hardware store. WolfVision is not taking liability if
substandard material is used or the installation is done incorrectly and not according to our
installation manual.
G
Mounting the Visualizer on the ceiling using WolfVision's ceiling mount can be done very quickly and
easily.
Fixing the assembly to the room ceiling depends on the particular construction and circumstances of
the desired mounting location.The mounting plate needs to be connected to the ceiling as illustrated in
fig 1. Ensure that the ceiling construction is able to carry a weight of 80 kilos (176 pounds)
and that
possible collision accidents are prevented.
In order to fix the assembly to the ceiling, please hold the
Ceiling Visualizer to the ceiling mount (fig. 2), connect it and
turn the unit by 90 degrees to the left or right (fig. 3). The unit is
now installed
only temporarily. The installation is not finished
yet!
Now, press the release button on the Visualizer to release the
unit (fig. 4) and pull the unit downwards (fig. 5).
Fix the folding mechanism with a pin to prevent injuries
because of unintentional fold up (fig. 5).
pin diameter: 2,5mm and length: 40mm
IMPORTANT: Ensure solid mounting and secure connection of all parts to
avoid the possibility that the unit detaches itself from the ceiling.
Important: Please give special attention to the country specific regulations
for training and conferencing rooms.
G
Fig .5
Fig .4
Fig .3
Fig.2
Fig. 1
Final position of
Visualizer with
ceiling mount
Direction
of the user
Direction
of the user
Lock pin
position
4