Selecting a site – Allied Telesis x900 Series Switch Benutzerhandbuch

Seite 5

Advertising
background image

Installation and Safety Guide

5

Selecting a Site

Before you install the switch, review the following considerations about its
location.

AT-8948, x900-48FE, and AT-9900 switches require an ambient temperature
from 0º C to 50ºC (32º F to 122º F).

AT-9924Ts, x900-24X switches require an ambient temperature from 0º C to
40ºC (32º F to 104º F).

There should be adequate airflow around the switch and its vents.

The site should be dust-free and without moisture.

Humidity can be from 5% to 80% non-condensing.

You need a reliable and earthed (grounded) power supply source, preferably
dedicated and filtered.

Cabling must not be exposed to sources of electrical noise, such as radio
transmitters, broadband amplifiers, power lines, electric motors, and
fluorescent fixtures.

Related network devices can be connected to the switch but cannot exceed
maximum cable lengths specified in the Hardware Reference.

You may need to remove doors to accommodate cords and cables.

Ensure easy access to the switch’s power and cable connections.

Advertising