Setup, Calibration – Weidmuller UCVAR - Universal glavanically isolated signal converter Benutzerhandbuch

Seite 20

Advertising
background image

20

•Setup

Changingthesetup
For setup mode, connect the security link and press the

Å

and

ì

keys simultaneously. The software version will be displayed (flashing). If
you wish to continue, press within 10 s.
Note: If you remove the security link at any time during the setup
sequence, any changes you have made will be discarded and the
instrument will reset.

•Calibration

General
The UCV/AR is factory calibrated. Once calibrated it will operate with
any input or output format without recalibration.
Allow the instrument 1 minutes of powered operation (to reach a
stable temperature) before calibration.
During calibration allow a few seconds for signals to stabilise before
accepting the value.
Equipment requirements
• A suitable current/voltage source (must be able to generate , 10,

20, 0 mA and , 10, 20, 0 V to ±0.0 % or better accuracy)

• An accurate digital multimeter (accurate to 0.0 mV and ±0.1 μA)

TerminalConnectionsforinputcalibration

CalibrationStage

Signaltype

Terminal

Current (mA) inputs

Milliamp source +

2

Milliamp source −

3

Voltage (V) inputs

Voltage source +

4

Voltage source −

3

Advertising