2 explanation of controls, 3implementation – TechniSat Base unit BS4 Light Benutzerhandbuch

Seite 18

Advertising
background image

18

EN

2.2 Explanation of controls




Image: Top view of TechniNet BS4 Light base unit

3

Implementation

The following prerequisites must be followed to prepare the TechniNet BS4 head station for use:

- Appropriate experience in constructing cable head stations and satellite reception equipment.
- Access to a professional digital measuring device with the following features:

• Level measurement in dBµV.
• Bit error rate (BER) measurement for QAM signals.
• Modulation error rate (MER) measurement for QAM signals.
• Spectrum analysis.

The head station should be mounted in rooms where the permitted ambient temperature
(0-45°C) can safely be maintained.
Please observe the safety instructions in section 1 at all times.

Potential equalisation

connection

Power supply

connection

Remote control

connection

LAN

connection

RF output

connection

SAT-IF / LNB

connection area

Optional

Sat-IF input

Optional

Sat-IF input

Advertising