Storage, Recommended accessories – Xylem R 503/D Benutzerhandbuch

Seite 18

Advertising
background image

R 503/P / R 503/D

18

ba15345e02

08/2007

Storage

Between two

measurements

Store the electrode in air.

Overnight to one

week

Put the electrode into diluted aqueous standard solution with
the filling opening open. To avoid a contamination of the
bridge electrolyte with standard solution, the level of the
bridge electrolyte must be clearly above the level of the
standard solution.
Fill in fresh bridge electrolyte for measurement.

For more than a

week

Remove the bridge electrolyte of the electrode, rinse the
electrode with deionized water and dab it dry with a clean
paper towel. Store the electrode in a dry place.

Recommended accessories

Description

Model

Order
no.

Bridge electrolyte for the
reference electrode R 503

ELY/BR/503

106575

Bridge electrolyte for the
reference electrode R 503 for
NO

3

-

determination

ELY/BR/503/N

106576

Bridge electrolyte for the
reference electrode R 503 for
K

+

determination

ELY/BR/503/K

106577

Advertising
Dieses Handbuch ist für die folgenden Produkte bezogen werden: