Enerpac PE-Series Benutzerhandbuch

Seite 4

Advertising
background image

4

4.0 INSTALLATION

Dump Valve Model

1. ON - OFF switch

2. External relief valve

3. Gauge port

4. Mounting holes

5. Return-to-tank port

6. Advance port

7. Remote pendant

3-Way, 2-Position Manual

Valve

1. ON - OFF switch

2. External relief valve

3. Gauge port

4. Mounting holes

5. Return-to-tank port

6. Advance port

3-Way, 3-Position Manual
and Solenoid Valve

1. ON - OFF switch

2. External relief valve

3. Gauge port

4. Mounting holes

5. Retract port

6. Advance port

4-Way Manual and Solenoid Valve

1. ON - OFF switch

2. External relief valve

3. Gauge port

4. Mounting holes

5. Retract port

6. Advance port

Gauges are recommended to monitor system pressure. A shutoff
valve can be installed between gauge and pump to bypass the
gauge and prolong its usefulness.

4.1 Electric Wiring

All 115V and 230V pumps are equipped with power cords and
plugs. No additional wiring is required.

Local electrical power sources may require changes to standard
plugs and cords on 230V models. If changes are required, use only
qualified electricians to accomplish the wiring.

4.2 Pump Mounting

1.

Mount pumps in vertical position with reservoir on a firm
foundation.

2.

Mounting holes rae located at each corner of the reservoir.
Hole size is .185 diameter - .195. Use self tapping screws.

5.0 OPERATION

1.

Open reservoir vent one
complete turn. Leave vent
open whenever pump is
operating.

2.

Check oil level prior to

starting pump. Oil level
gauge must be full. If
required, add oil to
reservoir.

Fill Cap

Oil Level

Gauge

1.

3.

7.

2.

4.

6.

5.

1.

3.

2.

4.

6.

5.

1.

3.

2.

4.

6.

5.

1.

3.

4.

5.

2.

6.

Advertising