4. Troubleshooting measures

.

If faults cannot be repaired, the system must be put out of operation
immediately and this information is to be given to the manufacturer.

Repairs must only be carried out by the manufacturer. Interventions and
changes on the appliance are not allowed.



In case of faults caused by defects of the hydraulic equipment the operators must inform their
superiors immediately and call in the qualified and authorised technical staff for maintenance.


Table: Fault description and measures

.

Type of fault

Measures


I. Unable to build up pressure during pre-
pressure generation




Close low-pressure shut-off valve

correctly



Attention: Do not tighten the shut-off

valve more than finger tight. Otherwise
the valve seat could be damaged.


II. Unable to build up further pressure at high-
pressure generation with the spindle pump




Close high-pressure shut-off valve

correctly



Please note: In case of an opened, or not

properly closed high-pressure shut-off
valve, the safety overflow valve is not
activated until approximately 100 bar are
reached, and the oil will flow back into the
tank. Therefore, no pressure > 100 bar
can be built up.


III. Unable to build up pressure / oil discharge at
the piston/cylinder system receptacle, or the test
specimen connection




Tighten the piston/cylinder system in the

piston receptacle (see section 3.1.2)



Tighten the test specimen with the

connecting adapter and knurled nut (see
section 3.1.3)



In case of wear or damage to the sealing

cone, proceed as described in section 5.2.


IV. Unable to build up pressure, or range cannot
be reached




After the clamping of the piston/cylinder

system and the test specimen, air may be
trapped in the system.



Please note: The system should be

vented before beginning with calibration.
For this purpose, proceed according to
section 3.1.4.



Afterwards, build the pressure back up.