Electrical installation

Connecting and disconnecting the battery pack of the optional UPS

5

55

LDCDS-CPC9100 DE/EN 1.0

5.3

Connecting and disconnecting the battery pack of the optional UPS

For the UPS functionality the battery pack has to be attached before commissioning the

IPC.
If the IPC is disconnected from the mains for a longer time (e. g. transport, storage), the

battery pack has to be disconnected, as otherwise the rechargeable batteries of the battery

pack may be damaged by an exhaustive discharge.

0

0

0

1

3

0

0

0

4

CPC9100-009

How to connect or disconnect the battery pack:
1. Open the housing:

– Loosen the six screws .
– Lift the housing cover upwards.

2. Connect/disconnect the plug  (white plug with a red and black cable) to/from the

connector of the power supply unit .
After removing the plug: Make sure that its contacts do not get in touch with other

electrical or electroconductive parts. Otherwise the device or parts of it may be

destroyed. We recommend to fix the plug with a cable tie.

3. Close the housing:

– Carefully place the housing cover  on the housing.
– Tighten the six screws .