Storage, Recommended accessories – Xylem R 503/D Benutzerhandbuch
Seite 18

R 503/P / R 503/D
18
ba15345e02
08/2007
Storage
Between two
measurements
Store the electrode in air.
Overnight to one
week
Put the electrode into diluted aqueous standard solution with
the filling opening open. To avoid a contamination of the
bridge electrolyte with standard solution, the level of the
bridge electrolyte must be clearly above the level of the
standard solution.
Fill in fresh bridge electrolyte for measurement.
For more than a
week
Remove the bridge electrolyte of the electrode, rinse the
electrode with deionized water and dab it dry with a clean
paper towel. Store the electrode in a dry place.
Recommended accessories
Description
Model
Order
no.
Bridge electrolyte for the
reference electrode R 503
ELY/BR/503
106575
Bridge electrolyte for the
reference electrode R 503 for
NO
3
-
determination
ELY/BR/503/N
106576
Bridge electrolyte for the
reference electrode R 503 for
K
+
determination
ELY/BR/503/K
106577