Extreme Networks 12800 Series Benutzerhandbuch

Seite 91

Advertising
background image

Extreme Networks 325 W DC Power Supply

BlackDiamond 12800 Series Switches Hardware Installation Guide

91

To install an Extreme Networks 325 W DC PSU:

1

Attach an ESD-preventive wrist strap to your wrist and connect the metal end to the ground
receptacle on the top right corner of the switch front panel.

2

Make sure that the Extreme Networks 325 W DC PSU is right side up (see

Figure 52

).

Figure 52: Extreme Networks 325 W DC PSU

3

Carefully slide the PSU all the way into an open power supply bay (see

Figure 53

) until you hear a

click.

Extreme Networks recommends that you populate the two left power supply bays before the two
right power supply bays. Refer to

Table 19

for the recommended installation sequence.

NOTE

A minimum of two Extreme Networks 325 W DC PSUs are required to run a BlackDiamond 12802 switch.

WARNING!

Do not put your hand into an open power supply bay when a power supply is not present. Empty power supply bays
require a cover plate at all times.

CAUTION

Do not slam the Extreme Networks 325 W DC PSU into the system switch backplane.

CAUTION

To prevent an electrical hazard, make sure before you install the PSU in the power supply bay that the DC power
cord is not connected to the PSU.

Table 19: Recommended Installation Sequence (View from Rear of Chassis)

Left Power Supply Bays

Right Power Supply Bays

Installation # 1

Installation # 3
(If this bay is empty, a cover plate is required.)

Installation # 2

Installation # 4
(If this bay is empty, a cover plate is required.)

.

325W DC PSU

Torino DC PSU_04A

Advertising