Servicing – M&C TechGroup MP47 Ex Operator's manual Benutzerhandbuch

Seite 96

Advertising
background image

KNF Motor M 56 Ex

Servicing

Translation of orignal Operating and Installation Instructions, english, KNF 121220-121648 01/13

16

8. Servicing

Servicing schedule

WARNING

Danger of explosion due to wear!

Î

Have motor bearings replaced by KNF Neuber-

ger according to servicing schedule
(see table 10).

Component

Servicing interval

Motor bearings

-

Have them replaced after 17,000
operating hours or 24 months at the
latest

Lead-through, con-
nection or lead-in
parts

-

Inspect regularly

-

In case of damage, the damaged parts
must be replaced by original spare
parts in perfect order.

Tab. 10

Î

Maintenance on the motor must be performed under obser-

vance of the relevant national regulations “Ordinance Concern-
ing Electrical Equipment in Potentially Explosive Areas” as well
as the safety advisories and descriptions in these instructions.

Î

Components such as terminals, cable glands and plugs may

be replaced only by equivalent parts having the EC-Type Ex-
amination Certificate.

Advertising