Electrical connections – WIKA T32.xS Benutzerhandbuch

Seite 34

Advertising
background image

GB

11258421.10 08/2014 GB/D

34

WIKA operating instructions model T32.xS

Should the cold junction compensation be operated with

an external resistance thermometer (2-wire connection),

connect this to terminals  and .

9.3.4 Connect mV sensor

Make sure that the mV sensor is connected with the correct polarity.

9.3.5 Potentiometer

Connection of a potentiometer is possible.

9.4 HART

®

signal

The HART

®

signal is measured directly via the 4 ... 20 mA signal line.

The measuring circuit must have a load of at least 250 Ω. However,

the load must not be too high, as otherwise, in the case of relatively

high currents, the terminal voltage at the transmitter will be too low.

For that reason, connect the cable clamps of the modem and/or

the HART

®

communicator, as described (see chapter 6.5 “HART

®

configuration tree” or use the existing communication connectors of a

power supply/line transformer. The connection of the HART

®

modem

and/or the HART

®

communicator is not dependant on polarity! The

HART

®

modem or the HART

®

communicator may also be connected

parallel to the resistor! When connecting an Ex version of the

transmitter, observe the special conditions for safe use (see chapter

10 “Notes for mounting and operating in hazardous areas”).

9. Electrical connections