Servicing – M&C TechGroup MP47 Ex Operator's manual Benutzerhandbuch
Seite 96

KNF Motor M 56 Ex
Servicing
Translation of orignal Operating and Installation Instructions, english, KNF 121220-121648 01/13
16
8. Servicing
Servicing schedule
WARNING
Danger of explosion due to wear!
Î
Have motor bearings replaced by KNF Neuber-
ger according to servicing schedule
(see table 10).
Component
Servicing interval
Motor bearings
-
Have them replaced after 17,000
operating hours or 24 months at the
latest
Lead-through, con-
nection or lead-in
parts
-
Inspect regularly
-
In case of damage, the damaged parts
must be replaced by original spare
parts in perfect order.
Tab. 10
Î
Maintenance on the motor must be performed under obser-
vance of the relevant national regulations “Ordinance Concern-
ing Electrical Equipment in Potentially Explosive Areas” as well
as the safety advisories and descriptions in these instructions.
Î
Components such as terminals, cable glands and plugs may
be replaced only by equivalent parts having the EC-Type Ex-
amination Certificate.