WIKA operating instructions bypass level indicator model BNA

112195.01 11/2012 GB/D

3. Installation and commissioning

The bypass level indicator is mounted in a vertical position on the vessel

to be monitored using the process connections (1) provided. Seals

(2), screws (3), washers (4) and nuts (5) suitable for the process

connection must be used. Choose a seal with a suitable corrosion

resistance. If necessary, shut-off valves must be mounted between the

vessel and the bypass.

Please heed the usual torque values of screws used in

pipefitting work. The bypass level indicator must be installed

without tension. Suitable seals must be used. Care must

be taken that the seal material is resistant to the medium

and its vapours as well as to the temperature and pressure

loads to be expected.

Installing the float

Clean the float of anything stuck on it in the area of the float magnet

system

Remove the base flange (7) and insert the float (6) into the tube

from the bottom (the marking "top" or a legible model code marks the

top side of the float)

Place the seal (9) onto the base flange. Replace the base flange

and fix it in place using the screws (8)

Commissioning

If the bypass level indicator is fitted with shut-off valves between

process connections and tank, proceed as follows.

Close draining and bleeding fittings on the bypass level indicator

with Plexiglass attachments, the float must be moved up and down

inside the tube. For magnetic roller displays with flushing connections,

these connections must have an airtight seal. Please refer in this case

to the mounting and operating instructions for WIKA magnetic roller

displays with flushing connections as well.