3. Installation and commissioning

Fig. 1: Bypass level indicator, model BNA

T = upper projection

M = centre to centre distance

U = lower projection

Slowly open the shut-off

valve at the upper process

connection

Slowly open the shut-off

valve at the lower process

connection. As liquid flows

into the bypass vessel,

the float floats to the top.

The magnetic system

turns the magnetic rollers

of the optical indicator

from „light“ to „dark“.

The current filling level

is shown after liquid

equalisation between the

vessel and the bypass

level indicator

Always heed the

mounting and

operating instructions

of attachment devices

before putting them into

operation