Gb 6. commissioning, operation – WIKA CEP3000 Benutzerhandbuch

Seite 17

Advertising
background image

17

WIKA operating instructions, model CEP3000

14036068.02 08/2012 GB/D

GB

6. Commissioning, operation

6.2.2 Simulating a thermocouple

A thermocouple cable has to be used in order to enable high accuracy calibration.

For maximum accuracy, wait for 10 minutes after switching on.

Device to be

checked

Device to be

checked

Use the wires of the

thermocouple so that the

calibration is as accurate

as possible.

Figure 1: Simulating resistances

Figure 2: Simulating a thermocouple

Advertising