6. Commissioning, operation

6.5 Assembly of the pressure balance
1. Fit the piston unit to the left hand connection. Ensure that the mating faces are clean

and the 12 mm diameter O-ring seal correctly located. Excess force is not required

to achieve an effective seal.

2. Check the level of the system base with the spirit level on the piston-cylinder

unit. Level if necessary by using the levelling screws. If using as a comparator, fit

additional loose union connection (order number 14031251) to port that piston unit

would be fitted to.

3. Fit the appropriate connection to the gauge stand, using a bonded seal to make the

joint and screw a test gauge (for installation use a known gauge) into position, also

with a bonded seal.

If preferred, a copper or leather washer can be substituted for the bonded seal at

the gauge. The loose nut on the pressure balance base enables the gauge to be

positioned as required and for back connection gauges the angle connection is

screwed into the loose union connection.

6.5.1 Filling the base unit with liquid
1. Remove filler plug from reservoir by prising plug out. (This plug should be left out

whilst in use).

2. Open valves A and B.
3. Wind spindle pump handle fully clockwise.
4. Fill reservoir with appropriate liquid. Use the oil supplied or an approved substitute

for oil systems. Do not use other liquids. Castor based oils, Skydrol, solvents or

similar liquids will attack the seals fitted in the pressure balance.

5. Wind spindle pump handle fully anti-clockwise.
6. Top up reservoir if necessary.

Wear safety goggles!

Protect eyes from flying particles and liquid splashes.

6.5.2 Post assembly test
1. Carry out a test calibration of a known instrument (see chapter 6.6 "Procedure") to

ensure that the unit is working correctly.