Cooltherm – Liebert Rack Enclosure With Integrated Liquid Cooling XDK-W Benutzerhandbuch

Seite 24

Advertising
background image

CoolTherm

Manual / Bedienungsanleitung

CoolTherm

01_998_330_0_k

page / Seite 22/83


-

Carefully bleed heat exchanger when filling the system.


-

Open the air bleed valve until the coming out water is bubble free.


-

Close this valve after bleeding carefully.








-

If necessary, re-tighten threaded fittings.


-

After an extended period without use, and particularly in case of risk of

frost, the heat exchanger and the supply pipe are to be completely drained.

-

Drain completely by blowing out with compressed air and remove all bleed

and drain plugs.










Air bleed valve

Chilled water
feed

Chilled water
return

Drain valve

Advertising