9.2 Checklist for unit installation


Checked performed

Completed

(After completion confirm
with signature

)

Comments

Check unit for damage on delivery

Check for level floor

Check max. floor load

CoolTherm feet adjusted
CoolTherm is level

Automatic door opening adjusted

No remains of packaging in the
CoolTherm

All installation tools removed

Cable entries into the
unit correct and air-tight

Cable connections checked

Chilled water connection does not leak
Pressure test performed

Chilled water network bled

Chilled water flow rate adjusted

Condensed water pipe clear

Chilled water system odour trap in order

Heat exchanger tray connected to
condensed water pipe

Fan function checked

All front panels closed
(separation of air flows)






.............................................

........................................

....................

Place:

Date:

Signature

Checker