English, Installation / preparation for commissioning – Pilz PSEN enc s2 eCAM Benutzerhandbuch

Seite 81

Advertising
background image

Installation / Preparation for commissioning

32

Pilz GmbH & Co. KG, Felix-Wankel-Straße 2, 73760 Ostfildern, Deutschland

Telefon +49 711 3409-0, Telefax +49 711 3409-133, E-Mail: [email protected]

English

Cable screw connection assembly, type B



Pos. 1 Union nut
Pos. 2 Clamping insert
Pos. 3 Inner O-ring
Pos. 4 Screw socket


1. Trim the shield braid / shield foil to the dimension "X" + 2 mm.
2. Slide the union nut (1) and clamping insert (2) over the cable.
3. Bend the shield braid / shield foil by approx. 90°.
4. Slide the clamping insert (2) up to the shield braid / shield foil and wrap the

braid back around the clamping insert (2), so that the braid goes over the
inner O-ring (3) but not over the cylindrical part or the torque supports.

5. Fit the screw socket (4) on the housing.
6. Push the clamping insert (2) into the screw sockets (4), so that the torque

supports fit into the lengthwise slots provided in the screw socket (4).

7. Screw the union nut (1) to the screw socket (4).




















Advertising
Dieses Handbuch ist für die folgenden Produkte bezogen werden: