English, Installation / preparation for commissioning – Pilz PSEN enc s2 eCAM Benutzerhandbuch

Seite 83

Advertising
background image

Installation / Preparation for commissioning

34

Pilz GmbH & Co. KG, Felix-Wankel-Straße 2, 73760 Ostfildern, Deutschland

Telefon +49 711 3409-0, Telefax +49 711 3409-133, E-Mail: [email protected]

English

5.7 Count direction

Fig. 11: Setting the count direction



The count direction of the measuring systems can be set via the DIP switch SW1:

– DIP switch = OFF:

Count direction increases in clockwise direction, viewed towards the flange
connection

– 41

– DIP switch = ON:

Count direction decreases in clockwise direction, viewed towards the
flange connection


Advertising
Dieses Handbuch ist für die folgenden Produkte bezogen werden: