2 safety, 2 informal safety measures, 3 intended use, warranty – Henkel LOCTITE 97504 Benutzerhandbuch

Seite 53: 4 qualification of operating and service staff

Advertising
background image

53

2 Safety

2.2 Informal

Safety

Measures

Always keep this manual readily available at the operating site.

In addition to the operating manual, provide and observe general and local
regulations for accident prevention and environmental protection.

All safety and hazard warnings on the equipment must always be kept legible.

2.3

Intended Use, Warranty

The Dual Rotor Pump Dispenser has been designed for accurate dispensing of
Loctite

®

Hysol

®

adhesives and sealants.

A list of approved products is provided in Section 8.4. Additional products may be
approved on request.

As the viscosities of the components of Loctite

®

Hysol

®

9463 differ significantly, the

equipment is not suitable for dispensing this product.
For any further questions relating to dispensing capabilities for this product please
contact your local Henkel Loctite Technical Service department.

Without the express written approval by the manufacturer, any
– modifications or additions
– use of unauthorised products
– use of non-original spare parts
– repairs performed by persons or companies not authorised by the
manufacturer
may result in loss of guarantee and warranty.

We cannot be held responsible for damage or injury of any kind because of failure to
observe the instructions in this Operating and Service Manual.

The dispensing station is not intended for use in potentially explosive areas.

2.4

Qualification of Operating and Service Staff

The provider/operator of the equipment is responsible for providing staff with the
required qualification. He has to make sure that only authorised staff will be assigned
to work on the dispensing station. We recommend that operating and servicing staff
should be required to provide confirmation in writing that they have taken note of the
instructions in this Operating and Service Manual.

Work inside the equipment, e.g. at the terminal block, may be accomplished
only by adept maintenance staff, see section 2.4.2.

Advertising