3 operation, Install full product container – Henkel LOCTITE 97504 Benutzerhandbuch

Seite 65

Advertising
background image

65

3 Operation

Install full product container

• Insert product container into Receptacle (N) and position underneath the Pump

Unit, between the 3 centering pins.

• Hold Pump Unit and back off locking screw (G).
• Lower the pump unit slowly until follower plate (S) rests against the container rim.
• Gently press down with your hand to lower the Pump Unit until product flows from

bleed port (Z).

• To prevent additional product from escaping, raise pump unit a bit and lightly hand

tighten the locking screw. Pump unit is locked into place.

• Screw vent screw (O) into the bleed port of the follower plate.
• Back off locking screw. Pump Unit rests by its own weight on top of the product.

Depending on the product being used, air bubbles entrapped after
replacement of the product container may result in uncontrolled
splashing
from the dispense gun. Be sure to keep a safe distance
and hold the dispense gun in an appropriate and safe position.

In addition, tubes can be bled as described in Section 3.3.4,
Bleeding of Tubing A .

Crush hazard: Risk of fingers getting crushed when pump unit is
lowered. Do not allow fingers to get between follower plate and
receptacle and/or product container.

Advertising