3 operation, 3 initial start-up 3.3.1 unpacking, 2 transportation – Henkel LOCTITE 97504 Benutzerhandbuch

Seite 59: 3 installation

Advertising
background image

59

3 Operation

3.3 Initial

Start-up

3.3.1 Unpacking

• Remove shipping materials.
• Check that items supplied are complete and match delivery note.

3.3.2 Transportation

The dispensing station has two carrying handles (L) at the sides – see Section 3.2.
Requires a minimum of two persons to carry.

Suitable for transportation by pallet trucks.

3.3.3 Installation

• Install in a suitable location. Provide:

– Power supply, socket.
– Compressed air supply.

• Position docking station for meter-mix dispense gun (optional).
• Plug connecting cable of dispense gun docking station (U) to connector (W)

(on the rear of the dispensing station) (optional).

• For start-up please refer to Section 3.3.4.

Do not switch the dispensing station on. Material damage can result
by running the system without product being pumped through it!

Advertising