Initial start-up and operation, Operating instructions/betriebsanleitung, wud-2x – WIKA WUD-26 Benutzerhandbuch
Seite 6

Operating instructions/Betriebsanleitung, WUD-2x
11611057.01 GB/D 11/2013
6
6. Packaging / 7. Initial start-up and operation
6. Packaging
Has everything been supplied?
Check the scope of supply:
■
Completely assembled pressure transducer
■
Inspect the pressure transducer for possible damage during transportation. Should there be any obvious
damage, inform the transport company and WIKA without delay.
■
The WIKA's UHP pressure transducers are purified, evacuated and double-packed in clean rooms in a
protective atmosphere (clean room class 5 according to ISO 14644). Special plastic protective caps are
used to protect the high-quality threaded connections (fittings). The pressure transducers should remain in
this special packaging until installation in order to prevent damage and contamination. Therefore remove the
ESD (Electro-Static-Discharge) protective foil only at the place of installation.
■
Keep the packaging, as it offers optimal protection during transportation (e.g. changing installation location,
shipment for repair).
■
Ensure that the pressure connection thread and the connection contacts will not be damaged.
■
Remove this protection cap only just before installing the pressure transducer.
■
Mount the protection cap when removing and transporting the instrument.
Unpacking the pressure transducer and integrated display
1. Remove the pressure transducer from the box.
2. Remove and discard only the outer protective bag, without damaging the inner ESD-protective bag.
3. Carry the pressure transducer (sealed in the inner bag), into the clean area.
7. Initial start-up and operation
■
For indoor use only.
■
Required tools: wrench (flats 19 and 16), screw driver (0.040" to 0.060" / 1 to 1.5 mm) and a pair of scissors,
allen key for WUD-26
GB