Commissioning, operation – WIKA CPP1200-X Benutzerhandbuch

Seite 23

Advertising
background image

23

WIKA operating instructions model CPP1200-X

GB

14076968.01 12/2013 GB/D

6. Commissioning, operation

6.4 Assembly
6.4.1 Connection of the test item and the reference measuring instrument

The instrument to be tested and the reference measuring instrument are inserted into

the two test connections and can be oriented. It doesn’t matter which port is used for

which instrument.

To calibrate instruments with a rear-mount connection, an angular

connector is available as an accessory.

WARNING!

Check that the seals in the test connections are seated correctly and are

not worn. Replace them if necessary.

It is important that any instrument that is to be connected is clean inside.

As standard, the test connections are G ½ female.

For calibrating instruments with other connection threads, the appropriate thread

adapter can be used (see chapter 10 “Accessories”).

6.4.2 Filling the base unit with liquid

1. Remove filler plug from reservoir by prising plug out. (This plug should be left out

whilst in use).

2. Open valves A and B.
3. Wind spindle pump handle fully clockwise.
4. Fill reservoir with appropriate liquid. Use the oil supplied or an approved substitute

for oil systems. Do not use other liquids. Castor based oils, Skydrol, solvents or

similar liquids will attack the seals fitted in the test pump.

5. Wind spindle pump handle fully anti-clockwise.