Power on / initialising, 1 push-button status change – EUCHNER HBLS 072725 Benutzerhandbuch

Seite 28

Advertising
background image

EUCHNER Pendant station HBLS 072725

067018-08-01/06

Subject to technical modifications

page 6 / 22

4. Power On / Initialising


Directly after Power On, the HBLS is in a non active state and a self test is executed.
During this time, the serial data interface is disabled.
The display shows the actual software version, built in.
Any changes of push buttons and selector switches are ignored.
First of all, the HBLS has to be initialised by the control.
This has to be done by requesting the actual states of the buttons and the selector switches,
by performing the function status check.

5. Acknowledge Push-button and Selector Switch Status change


Every status change of push-buttons and selector switches will be transmitted to the PLC.

When pushing two or more buttons at the same time, only the first will be transmitted. If one
button remains pushed, another button will be ignored, and the status will not be changed.

5.1 Push-button Status change


PLC

HBLS


Byte

1

STX

(02H)

Byte 1 DLE
Byte

2

Push-button

byte

(see

table)

Byte 3

DLE

Byte

4

ETX

(03H)


Byte 5

BCC

Byte 2 DLE









Advertising