3 installation, 1 incoming acceptance, transport and storage, 1 incoming acceptance – FMC Corporation - Talstar 80 Benutzerhandbuch

Seite 13: 2 transport, Installation, 3installation

Advertising
background image

Proline Promass 80 PROFIBUS PA

Installation

13

3

Installation

3.1

Incoming acceptance, transport and storage

3.1.1

Incoming acceptance

On receipt of the goods, check the following points:
• Check the packaging and the contents for damage.
• Check the shipment, make sure nothing is missing and that the scope of supply matches your

order.

3.1.2

Transport

The following instructions apply to unpacking and to transporting the device to its final location:
• Transport the devices in the containers in which they are delivered.
• The covers or caps fitted to the process connections prevent mechanical damage to the sealing

faces and the ingress of foreign matter to the measuring tube during transportation and storage.
Consequently, do not remove these covers or caps until immediately before installation.

• Do not lift measuring devices of nominal diameters > DN 40 (> 1½") by the transmitter housing

or the connection housing in the case of the remote version (Fig. 5). - Use webbing slings slung
round the two process connections. Do not use chains, as they could damage the housing.

• In the case of the Promass M / DN 80 sensor, use only the lifting eyes on the flanges to lift the

assembly!

#

Warning!
Risk of injury if the measuring device slips. The center of gravity of the assembled measuring device
might be higher than the points around which the slings are slung.
At all times, therefore, make sure that the device does not unexpectedly turn around its axis or slip.

a0004294

Fig. 5:

Instructions for transporting sensors with > DN 40 (> 1½")

Advertising