6 commissioning, 1 function check, 2 switching on the measuring device – FMC Corporation - Talstar 80 Benutzerhandbuch
Seite 46: Commissioning, Function check, Switching on the measuring device, 6commissioning

Commissioning
Proline Promass 80 PROFIBUS PA
46
6
Commissioning
6.1
Function check
Make sure that the following function checks have been performed successfully before switching on
the supply voltage for the measuring device:
• Checklist for "Post-installation check"
• Checklist for "Post-connection check"
6.2
Switching on the measuring device
Once the function check has been performed successfully, the device is operational and can be
switched on via the supply voltage. The device then performs internal test functions and the
following messages are shown on the local display:
Normal measuring mode commences as soon as startup completes.
Various measured value and/or status variables appear on the display (HOME position).
!
Note!
If startup fails, an error message indicating the cause is displayed.
PROMASS 80
START UP…
Start-up message
▼
DEVICE SOFTWARE
V XX.XX.XX
Current software version
▼
SYSTEM OK
→ OPERATION
Beginning of normal measuring mode