Panel mounting, Pipe mounting – FMC Corporation - Talstar 80 Benutzerhandbuch

Seite 24

Advertising
background image

Installation

Proline Promass 80 PROFIBUS PA

24

Panel mounting

1.

Prepare the opening in the panel as illustrated in the diagram.

2.

Slide the housing into the opening in the panel from the front.

3.

Screw the fasteners onto the wall-mount housing.

4.

Screw threaded rods into holders and tighten
until the housing is solidly seated on the panel wall. Afterwards, tighten the locking nuts.
Additional support is not necessary.

a0001131-ae

Fig. 18:

Panel installation (wall-mount housing)

Pipe mounting

The assembly should be performed by following the instructions in the diagram.

"

Caution!
If a warm pipe is used for installation, make sure
that the housing temperature does not exceed the max. permitted value of +60 °C (+140 °F).

a0001132-ae

Fig. 19:

Pipe mounting (wall-mount housing)

245 (9.65)

~110 (~4.33)

210 (8.27)

+0.5 (+0.019)

–0.5 (–0.019)

+0.5 (+0.019)

–0.5 (–0.019)

mm (inch)

Ш 20…70

(Ш 0.79…2.75)

~

~ 6.1)

155 (

mm (inch)

Advertising