6 post-connection check, Post-connection check – FMC Corporation - Talstar 80 Benutzerhandbuch

Seite 35

Advertising
background image

Proline Promass 80 PROFIBUS PA

Wiring

35

4.6

Post-connection check

Perform the following checks after completing electrical installation of the measuring device:

Device condition and specifications

Notes

Are cables or the device damaged (visual inspection)?

-

Electrical connection

Notes

Does the supply voltage match the specifications on the nameplate?

85 to 260 V AC (45 to 65 Hz)
20 to 55 V AC (45 to 65 Hz)
16 to 62 V DC

Do the cables comply with the specifications?

PROFIBUS PA

→ Page 26

Sensor cable

→ Page 29

Do the cables have adequate strain relief?

-

Cables correctly segregated by type?
Without loops and crossovers?

-

Are the power supply and signal cables correctly connected?

See the wiring diagram inside
the cover of the terminal
compartment

Are all screw terminals firmly tightened?

-

Are all cable entries installed, firmly tightened and correctly sealed?
Cables looped as "water traps"?

→ Page 34

Are all housing covers installed and firmly tightened?

-

Electrical connection of PROFIBUS

Notes

Are all the connecting components (T-boxes, junction boxes, connectors, etc.)
connected with each other correctly?

-

Has each fieldbus segment been terminated at both ends with a bus terminator?

-

Has the max. length of the fieldbus cable been observed in accordance with the
PROFIBUS specifications?

→ Page 27

Has the max. length of the spurs been observed in accordance with the PROFIBUS
specifications?

→ Page 27

Is the fieldbus cable fully shielded and correctly grounded?

→ Page 33