6. Commissioning, operation
Confirm selection by pressing ENTER/MENU.
Now use the arrow keys ▲▼ to select the required calibration function.
Standard linearisation according to DIN IEC 60751 [oFF
Use the arrow keys ▲▼ to select CoFF. Press ENTER/MENU to confirm the required
setting.
Press ESC to return to the measuring mode.
Calibration by code oP1
Use the arrow keys ▲▼ to select oP1. Press ENTER/MENU to confirm the required
setting. A small 1 appears in the lower part of the display. Four characters follow it (hex
code / 0 ... F). The 4 characters can be changed by means of the arrow key up ▲. To go
to the next number press the arrow key down ▼.
If all 4 characters are entered as required, confirm by pressing ENTER/MENU. A small 2
appears and the following 4 characters can be changed as well.
Press ESC to return to the measuring mode.
When calling the oP1 by means of ENTER/MENU the oP1 function
(calibration by code) is activated even if the menu has been closed by
pressing ESC.
MENU
Unit
Prob
Lin2
CAL
Chnl
ArEA
Lo6
CAL
oFF
oP1
oP2