Gb 6. commissioning, operation – WIKA DI25 Benutzerhandbuch

Seite 19

Advertising
background image

19

WIKA operating instructions digital indicator, model DI25

14076218.01 12/2013 GB/D

GB

6. Commissioning, operation

Output signal

Load

4 ... 20 mA

≤ 500 Ω

0 ... 20 mA

≤ 500 Ω

DC 0 ... 1 V

≥ 100 kΩ

DC 0 ... 5 V

≥ 500

DC 1 ... 5 V

≥ 500 kΩ

DC 0 ... 10 V

≥ 1 MΩ

6.3 Functional and operational description

At first, only turn on the voltage supply. The input configuration is indicated on the

display for approximately 3 seconds, the assigned end value is visible on the SV display.

During this time, all outputs and control displays are switched off.

Afterwards, the actual value is shown on the PV display and the alarm value is shown

on the SV display. Now all settings can be carried out in accordance with chapter

6.4 “Parameterisation”.

After parameterisation, switch off voltage supply and wire the sensor, thermocouple or

the resistance thermometer. Voltage supply may only be switched back on after wiring.

With the input configuration 4 ... 20 mA or 0 ... 20 mA, the included 50 Ω measurement

shunt must under all circumstance be connected to the terminals 18 and 19.

Sensor input

°C

°F

PV display

SV display

PV display

SV display

K

J

R

S

B

E

T

N